Post
  
  
  
  
Sort by AttachmentsUse SHIFT+ENTER to open the menu (new window).
  
Edit
  
SMWG: Possible SLE-SM Red-2 RID items
Item 1 - Do we need to explicilty state that an SR is sent as part of the perform operation Data Set Composition and Relationship Requirements
213/10/2008 12:08 PMPietras John
Picture Placeholder: Pietras John
Pietras John
 
  
SMWG: Items for the SM Concept Book
1. 'bilateral' includes completely bilateral services and partially CCSDS-compliant services e.g. configuration profiles with CCSDS uplinks and bilaterally-defined downlinks.
 
2. need to include diagram(s) showing relationship of offsets (transfer service profile)
81/11/2008 12:15 PMKelliher Hugh
Picture: Kelliher Hugh
Kelliher Hugh
BNSC
 
  
SMWG: Schema Issues
This discussion thread is intended to collect issues that are discovered regarding the SLE-SM XML schema.
112/4/2007 1:17 PMPietras John
Picture Placeholder: Pietras John
Pietras John
 
  
SMWG: Items to be Considered for Future (post-Blue-1) Versions of SLE(CS)- Service Management
This message serves as the base of a thread of messages regarding possible capabilities to be included in future (post-Blue-1) versions of the SLE(CS)-SM Service Specification. Specific topics should be posted as "replies" to this message, and further discussions of each topic should be posted as replies to that topic.
99/28/2007 3:29 PMPietras John
Picture Placeholder: Pietras John
Pietras John
 
  
UML Models Library
I recommend that as  UML diagrams that define the various elements of the service management framework for Red-2 are developed, that they be extracted and placed in a well-define folder in the CWE site.  Readers, and writers of the Red-2 document should find this useful as references to the various elements are made in various parts of the document that is in transition and with temporarily inconsistent models as each Section of the document is revised ahead of others. 
08/21/2007 3:44 AMZendejas Sil
Picture Placeholder: Zendejas Sil
Zendejas Sil
 
  
SMWG: List of Editorial Issues for Red-2
Base message thread for issues that are related to the editing of Red-2 and/or are not really significant from the point of view of major issues to be solved in development of Red-2
18/2/2007 10:31 PMBarkley Erik
Picture: Barkley Erik
Barkley Erik
 
  
SMWG: Service Agreement Modifications Needed
Base thread for collection Service Agreeement modifications information.  --Modifications are occurring throughout the service management recommendation in relation to production for the Red-2 version.  Modifications include but are not limited to things like the deletion of parameters, addition of new parameters, a renaming of parameters, etc.  The list of modifications that affect the service agreement section needs to be captured. Please add items for consideration as necessary. 
08/2/2007 10:15 PMBarkley Erik
Picture: Barkley Erik
Barkley Erik
 
  
SMWG - Issues for the Production of the SLE-SM Red-2 book
This message serves as the base of a thread of messages regarding outstanding issues with the forthcoming Red-2 version of the SLE-SM Service Specification. Under this top-level messages will be header messages for each of the sections of the SLE-SM Red Book. Specific issues should be posted as "replies" to those section-header messages, and further discussions of each issue should be posted as replies to that issue.
97/27/2007 9:11 AMPietras John
Picture Placeholder: Pietras John
Pietras John