Overview

Project Title

Proximity-1 Green Book Revision G-3

Approval

Approved

Document Number

210.0-G-3

Charter

5.04 Space Link Protocols Working Group

Document Type

Green

Description of Document

WG Chair spoke during Fall 2022 SLP WG meeting to the proposed Fig. 4-3 and text vs the current one. The difference was that the Prox-1 BB says in Table 6-7, that when a comm change from the hailing channel to the working channel is made, both the receive and transmit frequencies of the responding node must change at the same time. The error is in the Prox-1 GB and it simply needs to match up with what the BB is saying. Ken Andrews pointed out two small issues, which the WG chair will address: - In Figure 4-3, FROM: Reset Persistance TO: Reset Persistance(change frequency). (We actually use the term persistence in the specification but the term maybe unclear to the uninitiated) - In Fig. 4-3, make all the slopes of the lines in the figure the same.

Applicable Patents

There are no patent issues for this technology that are known by the CCSDS community

Patent Comments

N/A

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

N/A

Resources

Book Editor

NASA

Book Editor Resources

.1 FTE

Prototype 1

Not Required

Prototype 1 Resources

Prototype 2

Not Required

Prototype 2 Resources

Prototype 3

Not Required

Prototype 3 Resources

Contribute

ESA, NASA, UKSA

Monitor Only

CNES, DLR

Resource Comments

N/A

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet11/28/202211/28/202212/5/2022
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet11/30/202211/30/202212/6/2022
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet12/12/202212/5/20221/15/2023
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet12/19/202212/12/20222/15/2023
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet1/9/20233/1/2023
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet1/16/20233/15/2023
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet1/23/2023
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet1/30/2023
First Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
Secretariat Document Processing 2Magenta BulletBlue Bullet
Final Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
First Prototype DevelopmentBlue Bullet
Second Prototype DevelopmentBlue Bullet
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet5/15/2023
Total Time to Complete
(in months)
-1,451
5
Attachments
Version: 119.0
Created at 10/24/2022 5:25 PM by Greg Kazz
Last modified at 11/1/2023 2:00 PM by Greg Kazz