You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Mission Planning and Scheduling (Issue 2)
Approval
Approved
Document Number
529.0-G-2
Charter
2.07 Mission Planning And Scheduling
Document Type
Green
Description of Document
Issue 2 of the Mission Planning and Scheduling Green Book will be an update of the existing book published in June 2018. Currently, the work on the Mission Planning and Scheduling Services Blue Book is in an advanced stage. In addition, a Magenta Book on the Mission Planning and Scheduling Information Model in being planned. The issue 2 of the MP&S Green Book needs to be updated with the latest specification of the MP&S services and information model. In addition, a new issue of the MAL Blue Book is being published and the current MP&S Green Book shall be updated accordingly (for example, the dependency on the COM has been removed).
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
The work will be an update of an existing Green Book on Mission Planning and Scheduling, for which at the time it was investigated and found that there were no similar standards available, which is still the case today.
Resources
Book Editor
ESA
Book Editor Resources
2 weeks - only the sections 6 and 7 of the Green Book may require some updates. In addition, the intended Magenta Book on the Information Model shall be described.
Prototype 1
Prototype 1 Resources
Prototype 2
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
CNES, DLR, ESA, NASA, UKSA
Monitor Only
Resource Comments
This is an update of an existing Green Book, with limited changes expected.
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
4/15/2024
Project Start Date
5/1/2024
Internal WG Review
First Draft Circulated to WG
7/1/2024
First Draft Comments Due
9/1/2024
Second draft circulated to WG
10/1/2024
Second Draft Comments Due
11/1/2024
Final WB Submitted to AD for Further Processing
2/1/2025
External Milestones
Secretariat Document Processing
2/15/2025
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
6/1/2025
Total Time to Complete
(in months)
13
Attachments
Version: 83.0
Created at 3/5/2024 12:15 PM by Peter Van Der Plas
Last modified at 6/17/2024 12:32 PM by Brian Oliver