You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Mission Planning and Scheduling Information Model
Approval
Approved
Document Number
Charter
2.07 Mission Planning And Scheduling
Document Type
Magenta
Description of Document
The detailed description of the Mission Planning and Scheduling Information Model, including the relations between the various data types by means of UML diagrams, was previously included in the draft Mission Operations--Mission Planning and Scheduling Services Blue Book. During CESG poll for release of the Red Book for Agencies Review, it was agreed to move this material into a separate Magenta Book.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
This book will be in line with the Mission Planning and Scheduling Services Blue Book, for which it was already investigated that no similar standard is available. The current Magenta Book covers the same topic, and as such it can be stated that no similar standard is available.
Resources
Book Editor
ESA
Book Editor Resources
2 weeks - a first draft of the book was already created, as the information was extracted from the draft Mission Planning and Scheduling Services Blue Book book, and as such the remaining work to finalise the book is expected to be limited.
Prototype 1
Prototype 1 Resources
Prototype 2
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
CNES, DLR, ESA, NASA, UKSA
Monitor Only
Resource Comments
This book will contain existing material taken out from the draft Mission Planning and Scheduling Blue Book. As such, the resources required for this book are expected to be minimal.
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
4/15/2024
Project Start Date
5/1/2024
Internal WG Review
First Draft Circulated to WG
7/1/2024
First draft already available
First Draft Comments Due
7/15/2024
Second draft circulated to WG
9/1/2024
Second Draft Comments Due
9/15/2024
Final WB Submitted to AD for Further Processing
10/1/2024
External Milestones
Secretariat Document Processing
First Agency Review
12/1/2024
RID Resolution
3/1/2025
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
5/1/2025
Total Time to Complete
(in months)
12