Overview

Project Title

Wireless Network Communications Overview for Space Mission Operations (Issue 4)

Approval

Approved

Document Number

CCSDS-880.0-G-4

Charter

4.03 Onboard Wireless Working Group

Document Type

Green

Description of Document

Update/refresh of wireless networking tecnologies (focus is on 3GPP LTE/5G/6G and Wi-Fi) for space mission operations.

Applicable Patents

There are no patent issues for this technology that are known by the CCSDS community

Patent Comments

The existence of patents is known for 3GPP LTE/5G supporting technologies as this was the case for CCSDS-883-0-R-0. However, this is not a concern as the LTE and 5G ecosystem is world-wide, and all associated patents are reasonable and non-discriminatory (RAND).

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

The goal of the Green Book (GBv4) effort is to survey and review applicable wireless network standards including 3GPP and IEEE and standardize applicable protocols (such as 4G, LTE, 5G, 802.11ax, etc.) in support of exploration-class space missions. The revision project builds upon the specifications already in the upcoming CCSDS-0-883-B-2 book. The SOIS-WIR WG will liaise with SLS-RFM to ensure ITU and SFCG regulations and recommendations compliance including those for the Shielded Zone of the Moon.

Resources

Book Editor

NASA

Book Editor Resources

2.0

Prototype 1

Not Required

Prototype 1 Resources

Prototype 2

Not Required

Prototype 2 Resources

Prototype 3

Prototype 3 Resources

Contribute

CSA

Monitor Only

CSA, CNES, DLR, ESA, FSA, JAXA, NASA

Resource Comments

This project has been reviewed and agreed to buy the SOIS-WIR WG NASA and CSA members.

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet2/1/2024
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet2/1/2024
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet3/1/2024
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet3/15/2024
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet4/15/2024
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet5/1/2024
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet5/15/2024
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet6/15/2024
First Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
Secretariat Document Processing 2Magenta BulletBlue Bullet
Final Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
First Prototype DevelopmentOrange BulletBlue Bullet
Second Prototype DevelopmentBlue Bullet
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet7/15/2024
Total Time to Complete
(in months)
5
Attachments
Version: 27.0
Created at 1/17/2024 11:26 AM by Kevin Gifford
Last modified at 5/29/2024 12:16 PM by Brian Oliver