You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Secure Interconnection Guide Magenta Book
Approval
Approved
Document Number
Charter
1.02 Security Working Group
Document Type
Magenta
Description of Document
A Secure Interconnection Guide Green Book currently exists (350.4) but with the expanding use of Agency interconnections, there is a need to create a normative version of the interconnection guide that provides normative actions to securely interconnect systems owned by different Agencies.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Existing secure interconnection GB from which the normative 'shall' statements will be extracted into a normative MB.
Resources
Book Editor
NASA
Book Editor Resources
.2 FTE
Prototype 1
Not Required
Prototype 1 Resources
N/A
Prototype 2
Not Required
Prototype 2 Resources
N/A
Prototype 3
Not Required
Prototype 3 Resources
N/A
Contribute
NASA
Monitor Only
CNES, DLR, ESA, JAXA, UKSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
5/1/2024
Project Start Date
5/20/2024
Internal WG Review
First Draft Circulated to WG
7/1/2024
First Draft Comments Due
9/9/2024
Second draft circulated to WG
11/25/2024
Second Draft Comments Due
1/13/2025
Final WB Submitted to AD for Further Processing
5/5/2025
External Milestones
Secretariat Document Processing
6/16/2025
First Agency Review
9/8/2025
RID Resolution
11/10/2025
Secretariat Document Processing 2
1/5/2026
Final Agency Review
3/2/2026
RID Resolution
5/4/2026
First Prototype Development
Second Prototype Development
CMC Approval
6/15/2026
Total Time to Complete
(in months)
24
Attachments
Version: 142.0
Created at 11/9/2023 6:13 AM by Howard Weiss
Last modified at 7/26/2024 2:49 PM by Howard Weiss