You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Bundle Protocol for CCSDS (was DTN Protocol)
Approval
Approved
Document Number
734.2
Charter
6.09 Delay Tolerant Networking Working Group
Document Type
Blue
Description of Document
<div>Protocol specification for an internetworking protocol suitable for space communication.</div>
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
Lee Pitts (for NASA)
Prototype 1
Other
Prototype 1 Resources
An enhanced version of the DTN2 BP implementation from the Internet Research Task Force dtnrg. The NASA Space DTN Project has been maintaining the DTN2 implementation compatible with the BP-for-CCSDS Spec.
Prototype 2
NASA
Prototype 2 Resources
NASA will provide the ION Open Source (IOS) implementation.
Prototype 3
Prototype 3 Resources
Contribute
UKSA
Monitor Only
CSA, DLR, INPE, JAXA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
3/1/2008
Project Start Date
3/1/2008
Internal WG Review
First Draft Circulated to WG
3/15/2009
Slipped from 10/15/2008
First Draft Comments Due
4/15/2009
Second draft circulated to WG
9/15/2009
Slipped from 3/15/2009
Second Draft Comments Due
10/15/2009
Final WB Submitted to AD for Further Processing
3/1/2010
External Milestones
Secretariat Document Processing
3/15/2010
First Agency Review
5/15/2010
RID Resolution
6/15/2010
Secretariat Document Processing 2
8/15/2010
Final Agency Review
9/15/2010
RID Resolution
10/15/2010
First Prototype Development
3/15/2011
Begin development / adopt existing implementation
Second Prototype Development
3/15/2011
Begin development / adopt existing implementation
CMC Approval
3/15/2011
CMC Poll Approval
Total Time to Complete
(in months)
36
Attachments
Version: 224.0
Created at 9/24/2008 12:56 PM by Scott Keith
Last modified at 10/9/2015 7:34 AM by Peccia Nestor