Overview

Project Title

Update AOS to Version 5 Blue Book

Approval

Approved

Document Number

732.0-B

Charter

5.04 Space Link Protocols Working Group

Document Type

Blue

Description of Document

Create Version 5 of AOS SDLP to accommodate 64K byte AOS transfer frames by defining 16-bit First Header Pointer (using 5 spare bits in M_PDU header) and sweep the change to Section 4.1.2.6 AOS Frame Header Error Control Field into this new version as well.

Applicable Patents

There are no patent issues for this technology that are known by the CCSDS community

Patent Comments

N/A

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

N/A

Resources

Book Editor

NASA

Book Editor Resources

.05 FTE

Prototype 1

Not Required

Prototype 1 Resources

Not needed, since the expansion of the First Header Pointer to 16 bits was interoperability tested in USLP. So this capability is covered by analogy.

Prototype 2

Not Required

Prototype 2 Resources

Not needed, since the expansion of the First Header Pointer to 16 bits was interoperability tested in USLP. So this capability is covered by analogy.

Prototype 3

Not Required

Prototype 3 Resources

Not needed, since the expansion of the First Header Pointer to 16 bits was interoperability tested in USLP. So this capability is covered by analogy.

Contribute

CNES, ESA, NASA, UKSA

Monitor Only

DLR

Resource Comments

N/A

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet5/17/2023
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet5/17/2023
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet5/17/2023
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet6/14/2023
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet7/12/2023
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet8/9/2023
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet8/22/2023
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet9/5/2023
First Agency ReviewMagenta BulletBlue Bullet10/2/2023
RID ResolutionMagenta BulletBlue Bullet11/6/2023
Secretariat Document Processing 2Magenta BulletBlue Bullet11/27/2023
Final Agency ReviewMagenta BulletBlue Bullet1/8/2024
RID ResolutionMagenta BulletBlue Bullet1/15/2024
First Prototype DevelopmentOrange BulletBlue Bullet1/16/2024
Second Prototype DevelopmentBlue Bullet2/10/2024
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet3/15/2024
Total Time to Complete
(in months)
10