You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
2020SpringReg
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
USLP 732.1 Technical Corrigenda Annex C (subpart of the USLP Blue Book Revsions 3.0 Project)
Approval
Draft
Document Number
732.1-B-2
Charter
5.04 Space Link Protocols Working Group
Document Type
Blue
Description of Document
This project is actually a "sub-project" of the USLP Revisions Version 3.0 Project. Two changes (technical corrigenda) are required to be made to Annex C (Proximity-1 mapping to USLP frame format) within the Version 2 USLP Blue Book. They are minor in nature.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
N/A
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
No other standards are affected.
Resources
Book Editor
NASA
Book Editor Resources
.05 FTE
Prototype 1
Other
Prototype 1 Resources
N/A
Prototype 2
Other
Prototype 2 Resources
N/A
Prototype 3
Other
Prototype 3 Resources
N/A
Contribute
NASA, UKSA
Monitor Only
CNES, DLR, ESA
Resource Comments
2 minor changes to annex C - C1.5 which was a typo - the correct information was in the Chapter 4; And C1.8 which requires a rewording for clarity to the user.
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
5/20/2022
Project Start Date
5/27/2022
Internal WG Review
First Draft Circulated to WG
6/3/2022
First Draft Comments Due
6/10/2022
Second draft circulated to WG
Second Draft Comments Due
Final WB Submitted to AD for Further Processing
External Milestones
Secretariat Document Processing
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
Total Time to Complete
(in months)
-1,445
Attachments
Version: 44.0
Created at 3/18/2022 5:08 PM by Greg Kazz
Last modified at 5/14/2023 12:23 PM by Greg Kazz