You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Navigation Data Messages XML Specification V.3
Approval
Approved
Document Number
505.0
Charter
2.02 Navigation Working Group
Document Type
Blue
Description of Document
This document specifies a standard for use in exchanging spacecraft navigation data between space agencies using XML representations of the data messages developed by the CCSDS Navigation Working Group. The rationale for this particular update is to maintain currency with the ODM and ADM document updates.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
None
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
There is no other standard that presents the CCSDS Navigation WG standards in XML format other than the present CCSDS document 505.0-B-n.
Resources
Book Editor
NASA
Book Editor Resources
The elapsed time for this document will be contingent upon the development progress of the CCSDS Orbit Data Messages and Attitude Data Messages. It may take up to a year for document and schema development, but the FTE resources will be considerably less (probably 3 to 4 FTE months at most)
Prototype 1
NASA
Prototype 1 Resources
Testing of the schemas and messages will be ongoing with the document development. The final test will take about a week of elapsed time. Total FTE labor is estimated to be about 1 month.
Prototype 2
Prototype 2 Resources
Zero (0) resources necessary for a second prototype. Consistent with the NDM/XML Version 2 prototyping, only a single prototype implementation is proposed since the schemas on the SANA Registry will be the same for ALL users, and the astrodynamic content of the ODM V.3 and ADM V.2 will be tested in the prototyping of these 2 Blue Books. Thus only a single prototype for the NDM/XML is sufficientl
Prototype 3
Prototype 3 Resources
Not applicable.
Contribute
ESA, NASA
Monitor Only
CNES, DLR, JAXA, UKSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
12/31/2021
CMC-P-2021-09-007 Approval of 2 New MOIMS - Navigation Working Group Projects
Project Start Date
1/3/2022
Presentation at Fall Meetings 2021
Internal WG Review
First Draft Circulated to WG
2/28/2022
First Draft Comments Due
3/15/2022
Second draft circulated to WG
4/15/2022
Second Draft Comments Due
4/30/2022
Final WB Submitted to AD for Further Processing
5/15/2022
External Milestones
Secretariat Document Processing
7/15/2022
CESG-P-2022-10-001/CMC-P-2022-11-002
First Agency Review
9/15/2022
RID Resolution
9/30/2022
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
11/1/2022
Second Prototype Development
Not necessary
CMC Approval
12/15/2022
Total Time to Complete
(in months)
11