You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Mission Operations - Message Abstraction Layer (MAL) - B-3
Approval
Approved
Document Number
521.0
Charter
2.04 Spacecraft Monitoring and Control Working Group
Document Type
Blue
Description of Document
The SM&C WG has thoroughly and critically reviewed the underlying concepts of the MO Framework and the M&C services. This effort is labeled as MO 2.0. All participating agencies have provided input and points for improvement. The focus has been on simplification and increasing the potential for adoption of the SM&C standards. MAL being the core of the MO framework, the WG has concluded the review of the current MAL concepts and agreed on a set of changes as the as the first step in this context. This project is for implementing the changes to MAL that have been agreed by all representatives of the agencies participating to the SM&C WG.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
This project is the update of an already published Blue Book.
Resources
Book Editor
ESA
Book Editor Resources
1 mm
Prototype 1
ESA
Prototype 1 Resources
1 mm
Prototype 2
CNES
Prototype 2 Resources
1 mm
Prototype 3
Prototype 3 Resources
Contribute
DLR, NASA
Monitor Only
FSA, JAXA
Resource Comments
ESA and CNES have already committed the resources. The update of the book has started and work on prototyping will follow.
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
10/31/2021
Project Start Date
12/1/2021
Internal WG Review
First Draft Circulated to WG
2/28/2022
First Draft Comments Due
3/31/2022
Second draft circulated to WG
Second Draft Comments Due
Final WB Submitted to AD for Further Processing
4/28/2022
External Milestones
Secretariat Document Processing
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
10/15/2022
Second Prototype Development
10/15/2022
CMC Approval
12/31/2022
Total Time to Complete
(in months)
13
Attachments
Version: 491.0
Created at 9/16/2021 9:24 AM by Mehran Sarkarati
Last modified at 4/1/2024 3:47 PM by Brian Oliver