You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Cross Support Reference Model—Part 1: Space Link Extension Services update to B-3
Approval
Approved
Document Number
CCSDS 910.4-B-2
Charter
3.06 Cross Support Transfer Services Working Group
Document Type
Blue
Description of Document
As per title, defines a cross support reference model for the space link extension (SLE)
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
Tim Pham
Prototype 1
Not Required
Prototype 1 Resources
no prototype required
Prototype 2
Not Required
Prototype 2 Resources
no prototype required
Prototype 3
Not Required
Prototype 3 Resources
no prototype required
Contribute
ESA
Monitor Only
Resource Comments
The update will be quite minor. Basically B-3 will state that there will be no further SLE services in addition to the existing ones. Later services will be specified as Cross Support transfer Services (CSTS).
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
8/15/2022
Project Start Date
8/15/2022
Internal WG Review
First Draft Circulated to WG
8/31/2022
First Draft Comments Due
9/15/2022
Second draft circulated to WG
9/30/2022
Second Draft Comments Due
10/15/2022
Final WB Submitted to AD for Further Processing
10/31/2022
External Milestones
Secretariat Document Processing
11/15/2022
First Agency Review
1/1/2023
RID Resolution
2/28/2023
Secretariat Document Processing 2
3/31/2023
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
5/1/2023
Total Time to Complete
(in months)
8