You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Simultaneous Transmission of GMSK Telemetry and PN Ranging - Issue2
Approval
Approved
Document Number
413.1
Charter
5.01 RF and Modulation Working Group
Document Type
Green
Description of Document
This Informational Report is an adjunct document to the CCSDS Recommended Standard for Pseudo-Noise (PN) Ranging Systems (CCSDS 414.1-B-1). It provides background information and discussion of technical details related to the PN ranging systems defined by the CCSDS Recommended Standard. It is due for review in 2022 and this update will introduce clarifications and editorial improvements.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
N/A
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
N/A
Resources
Book Editor
ESA
Book Editor Resources
1 man month
Prototype 1
Not Required
Prototype 1 Resources
N/A
Prototype 2
Not Required
Prototype 2 Resources
N/A
Prototype 3
Not Required
Prototype 3 Resources
N/A
Contribute
ESA, NASA
Monitor Only
CNES
Resource Comments
The needed clarifications and editorial improvements have already been identified by the RDM WG.
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
6/15/2021
CMC-P-2021-05-007
Project Start Date
6/15/2021
Internal WG Review
First Draft Circulated to WG
6/15/2021
First Draft Comments Due
6/20/2021
Second draft circulated to WG
6/25/2021
Second Draft Comments Due
6/20/2021
Final WB Submitted to AD for Further Processing
7/10/2021
Resolution SLS-R-2021-05-006(413.1-G.GMSK+PNrang.PublishIssue2)
External Milestones
Secretariat Document Processing
12/10/2021
First Agency Review
N/A
RID Resolution
N/A
Secretariat Document Processing 2
N/A
Final Agency Review
N/A
RID Resolution
N/A
First Prototype Development
N/A
Second Prototype Development
N/A
CMC Approval
3/30/2022
Total Time to Complete
(in months)
9
Attachments
Version: 112.0
Created at 5/11/2021 6:14 AM by Gian Paolo Calzolari
Last modified at 12/2/2021 3:38 PM by Brian Oliver