You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Wireless Proximity Network Communications with Roaming
Approval
Approved
Document Number
883.0
Charter
4.03 Onboard Wireless Working Group
Document Type
Blue
Description of Document
Revision of SOIS-WIR Proximity Wireless Network Communications Blue Book to include: -- 3GPP Gateway Core Networking (GWCN) capabilities, IEEE 802.11 Wi-Fi security specification (WPA-3 Enterprise), and Enumeration of specific Wi-Fi Alliance (WFA) sub certifications. Notes: This effort will align with the current 883-0-B-1 publication date but will start as soon as possible as the revisions are just extensions on top of the current 883 book. Resources from contributing agencies are confirmed to be available for an immediate start. The schedule is somewhat compressed to meet milestones for an upcoming major international mission.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
The existence of patents is known for 3GPP LTE/5G supporting technologies as this was the case for CCSDS-883-0-R-0. However, this is not a concern as the LTE and 5G ecosystem is world-wide, and all associated patents are reasonable and non-discriminatory (RAND).
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
The goal of the Blue Book effort is to recommend applicable wireless network standards including 3GPP and IEEE and standardize applicable protocols (such as 4G, LTE, 5G, 802.11ax, etc.) in support of exploration-class space missions. The revision project builds upon the interoperability specifications already in the upcoming CCSDS-0-883-B-0 book. The SOIS-WIR WG will liaise with SLS-RFM to ensure ITU and SFCG regulations and recommendations compliance including those for the Shielded Zone of the Moon.
Resources
Book Editor
NASA
Book Editor Resources
2.0 man-month (0.167 man-year)
Prototype 1
NASA
Prototype 1 Resources
2.0 man-month (0.167 man-year)
Prototype 2
CSA
Prototype 2 Resources
2.0 man-month (0.167 man-year)
Prototype 3
Prototype 3 Resources
Contribute
CSA, NASA
Monitor Only
FSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
4/1/2021
Project Start Date
4/1/2021
Internal WG Review
First Draft Circulated to WG
5/15/2021
First Draft Comments Due
6/1/2021
Second draft circulated to WG
6/15/2021
Second Draft Comments Due
7/1/2021
Final WB Submitted to AD for Further Processing
7/15/2021
External Milestones
Secretariat Document Processing
8/1/2021
Important to start review process 01-Aug-2021
First Agency Review
10/1/2021
RID Resolution
11/1/2021
Secretariat Document Processing 2
11/15/2021
Final Agency Review
1/15/2022
* Conservative, may not be needed
RID Resolution
2/15/2022
First Prototype Development
3/1/2021
Second Prototype Development
3/1/2021
CMC Approval
3/1/2022
Total Time to Complete
(in months)
11
Attachments
Version: 204.0
Created at 1/18/2021 4:43 PM by Kevin Gifford
Last modified at 5/29/2024 11:26 AM by Brian Oliver