You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
USLP Green Book Version 2
Approval
Approved
Document Number
700.1
Charter
5.04 Space Link Protocols Working Group
Document Type
Green
Description of Document
The SLP WG has been collecting updates to the version 1 Green book and has accumulated a number of changes to warrant the release of a new version. These changes include to a great extent but are not limitied to: o limit the Frame Error Control Field options to CRC-16 (i.e. removing CRC-32 option), o clarify the way USLP interfaced to TC Coding Layer, o clarify options about USLP Truncated transfer Frames, o clarify applicability of COP-1 and COP-P, o clarify usage of AD and BD Frames when COP-1 is applied
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
None
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
None
Resources
Book Editor
NASA
Book Editor Resources
0.1 FTE
Prototype 1
Not Required
Prototype 1 Resources
N/A
Prototype 2
Not Required
Prototype 2 Resources
N/A
Prototype 3
Not Required
Prototype 3 Resources
N/A
Contribute
ESA, NASA, UKSA
Monitor Only
CNES, DLR
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
11/15/2020
CMC-P-2020-11-003
Project Start Date
11/22/2020
Internal WG Review
First Draft Circulated to WG
2/16/2021
First Draft Comments Due
3/15/2021
Second draft circulated to WG
7/15/2021
Second Draft Comments Due
9/15/2021
Final WB Submitted to AD for Further Processing
11/15/2021
External Milestones
Secretariat Document Processing
1/15/2022
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
3/1/2022
Total Time to Complete
(in months)
15
Attachments
Version: 195.0
Created at 10/30/2020 11:51 AM by Greg Kazz
Last modified at 11/19/2024 1:11 PM by Greg Kazz