You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
TM Space Data Link Protocol, Issue 3
Approval
Approved
Document Number
132.0
Charter
5.04 Space Link Protocols Working Group
Document Type
Blue
Description of Document
The CCSDS Recommended Standard for TM Space Data Link Protocol specifies the protocol, services, and procedures pertaining to the CCSDS Version-1 Transfer Frame. The 5-years review update will address integration with 355.1-B and other improvements.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
N/A
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
N/A
Resources
Book Editor
NASA
Book Editor Resources
1 Work Month (WM) shared by NASA/CNES/ESA
Prototype 1
Not Required
Prototype 1 Resources
Not required
Prototype 2
Not Required
Prototype 2 Resources
Not Required
Prototype 3
Not Required
Prototype 3 Resources
Not Required
Contribute
CNES, ESA, NASA
Monitor Only
DLR, UKSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
6/1/2020
CMC-P-2020-07-002 Approval of New Projects in the 5.04 Space Link Protocols WG
Project Start Date
6/2/2020
Internal WG Review
First Draft Circulated to WG
8/1/2020
First Draft Comments Due
9/30/2020
Second draft circulated to WG
11/1/2020
Second Draft Comments Due
3/1/2021
Final WB Submitted to AD for Further Processing
6/1/2021
External Milestones
Secretariat Document Processing
7/1/2021
First Agency Review
9/1/2021
RID Resolution
11/1/2021
Secretariat Document Processing 2
11/1/2021
No additional review expected
Final Agency Review
11/1/2021
RID Resolution
11/1/2021
First Prototype Development
11/1/2021
Not required
Second Prototype Development
11/1/2021
Not required
CMC Approval
2/1/2022
Total Time to Complete
(in months)
20
Attachments
Version: 167.0
Created at 5/6/2020 5:56 AM by Gian Paolo Calzolari
Last modified at 10/30/2021 9:34 PM by Laura Stafford