You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
“TM Synchronization and Channel Coding - Summary of Concept and Rationale, Informational Report” Green Book Issue 3
Approval
Approved
Document Number
130.1
Charter
5.02 Space Link Coding and Synchronization Working Group
Document Type
Green
Description of Document
This Informational Report contains the concept and supporting rationale for the TM Synchronization and Channel Coding Recommended Standard and includes performance data and historical background information on code selection. Issue 3 will update CCSDS 130.1-G to include material about o alternative architectures for encoders at high data rates, and o turbo codes sensitivity to burst errors
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
N/A
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
N/A
Resources
Book Editor
NASA
Book Editor Resources
Total resources: 2 work-months, primarily shared between NASA and ESA. Nominal time from other Working Group members to review the document. Lead editor: NASA.
Prototype 1
Not Required
Prototype 1 Resources
Prototype 2
Not Required
Prototype 2 Resources
Prototype 3
Not Required
Prototype 3 Resources
Contribute
ESA, NASA
Monitor Only
ESA, NASA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
6/5/2019
CMC-P-2019-05-003 closed 5 June 2019
Project Start Date
6/10/2019
Internal WG Review
First Draft Circulated to WG
6/15/2019
Before Fall 2019 Meeting
First Draft Comments Due
6/15/2019
Second draft circulated to WG
8/15/2019
Second Draft Comments Due
8/30/2019
Final WB Submitted to AD for Further Processing
9/15/2019
Resolution SLS-R-2019-11-002
External Milestones
Secretariat Document Processing
10/15/2019
CESG Poll started 30 April 2020
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
11/15/2019
Poll CMC-P-2020-06-001 closed 15 June 2020
Total Time to Complete
(in months)
5