You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Licklider Transmission Protocol - 5-year Review
Approval
Approved
Document Number
734.1
Charter
6.09 Delay Tolerant Networking Working Group
Document Type
Blue
Description of Document
This product of this project will be a revised LTP Blue Book. Changes proposed include removal of the "green" data transmission option, removal of the optional security extensions, and revision of the segment header structure for simpler implementation in hardware.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
This is a 5-year review of a CCSDS standard. No similar review is being undertaken elsewhere in CCSDS or in IETF.
Resources
Book Editor
NASA
Book Editor Resources
5 work months
Prototype 1
NASA
Prototype 1 Resources
2 work months
Prototype 2
ESA
Prototype 2 Resources
5 work months
Prototype 3
Prototype 3 Resources
Contribute
ESA, NASA
Monitor Only
Resource Comments
Resources, contributors, and monitors for this project have not yet been identified. The project is being posted in order for the DTN WG to begin tracking it in planning and scheduling.
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
11/6/2020
Project Start Date
1/25/2021
Internal WG Review
First Draft Circulated to WG
4/8/2021
First Draft Comments Due
6/1/2021
Second draft circulated to WG
8/16/2021
Second Draft Comments Due
9/13/2021
Final WB Submitted to AD for Further Processing
10/8/2021
External Milestones
Secretariat Document Processing
1/11/2022
First Agency Review
3/21/2022
RID Resolution
4/17/2022
Secretariat Document Processing 2
6/29/2022
Final Agency Review
9/3/2022
RID Resolution
10/5/2022
First Prototype Development
8/21/2022
Second Prototype Development
8/21/2022
CMC Approval
11/19/2022
Total Time to Complete
(in months)
21
Attachments
Version: 223.0
Created at 5/30/2019 8:43 PM by Scott Burleigh
Last modified at 7/21/2023 11:10 AM by Robert Durst