You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
2020SpringReg
Recycle Bin
Site Contents
Manage Permissions
|
Version History
Overview
Project Title
SCCC extension
Approval
Approved
Document Number
131.21
Charter
5.02 Space Link Coding and Synchronization Working Group
Document Type
Orange
Description of Document
The purpose of the proposed work is to issue an experimental recommendation (Orange Book) that extends the existing Blue Book, CCSDS 131.2-B-1 “Flexible Advanced Coding and Modulation Scheme for High Rate Telemetry Applications”, in order to add new modulation and coding options (MODCODs), i.e., increasing the range of operating conditions to higher signal-to-noise ratios.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
3 mm
Prototype 1
Prototype 1 Resources
Prototype 2
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
Monitor Only
CNES, DLR, NASA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
12/15/2018
CMC-P-2018-12-007 approved 28 Dec. 2018
Project Start Date
2/15/2019
Internal WG Review
First Draft Circulated to WG
4/30/2019
Before Fall19 meeting
First Draft Comments Due
5/30/2019
Second draft circulated to WG
9/30/2019
Second Draft Comments Due
10/30/2019
Final WB Submitted to AD for Further Processing
11/30/2019
SLS-R-2020-01-001 issued 16 January
External Milestones
Secretariat Document Processing
3/30/2020
CESG Poll for Publication started 31 May 2020
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
5/30/2020
Total Time to Complete
(in months)
15
Attachments
Version: 162.0
Created at 12/3/2018 5:22 AM by Massimo Bertinelli
Last modified at 5/28/2021 7:48 AM by Laura Stafford