You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Space Packet Protocol, Issue 2
Approval
Approved
Document Number
133.0
Charter
5.04 Space Link Protocols Working Group
Document Type
Blue
Description of Document
Revise CCSDS 133.0-B-1 to modify and limit the scope of concepts such as Logical Data Path and APID Qualifiers. Redefine them to apply specifically to ABA type of configurations and not use them to describe networking.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
Total resources: 1.5 work months, primarily shared between NASA and UKSA. Nominal time from other Working Group members to review the document. Lead editor: NASA.
Prototype 1
Not Required
Prototype 1 Resources
No Prototype is required as only current concepts e.g., LDP are to be revised.
Prototype 2
Not Required
Prototype 2 Resources
No Prototype is required as only current concepts e.g., LDP are to be revised.
Prototype 3
Not Required
Prototype 3 Resources
No Prototype is required as only current concepts e.g., LDP are to be revised.
Contribute
UKSA
Monitor Only
CNES, DLR, ESA
Resource Comments
CLTC/BITT also monitoring
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
1/8/2018
Aprroved
Project Start Date
3/12/2018
Prior to Spring 2018 Meeting
Internal WG Review
First Draft Circulated to WG
3/12/2018
Prior to Fall 2018 Meeting
First Draft Comments Due
4/9/2018
At Fall 2018 Meeting
Second draft circulated to WG
6/17/2018
Before Spring 19 Meeting
Second Draft Comments Due
10/1/2018
Before Spring 19 Meeting
Final WB Submitted to AD for Further Processing
11/1/2018
Following Spring 19 Meeting
External Milestones
Secretariat Document Processing
12/15/2019
First Agency Review
1/15/2019
Close of Agency Review
RID Resolution
2/1/2019
Secretariat Receipt Acknowledgement SDR-2004-01
Secretariat Document Processing 2
3/1/2019
Poll CESG-P-2020-04-002 started 30 April 2020
Final Agency Review
4/15/2019
Only one Agency review held.
RID Resolution
5/1/2019
Only one Agency review held.
First Prototype Development
5/1/2019
No Protoype Required
Second Prototype Development
5/1/2019
No Protoype Required
CMC Approval
5/30/2019
Poll CMC-P-2020-06-002 closed 15 June 2020
Total Time to Complete
(in months)
14
Attachments