You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Optical Communications Physical Layer (Issue 2)
Approval
Approved
Document Number
141.0
Charter
5.10 Optical Communications Working Group
Document Type
Blue
Description of Document
Addition of Optical On/Off Keying to the Optical Communications Physical Layer Blue Book for the Low Complexitiy Scenario.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
Other
Book Editor Resources
NASA 0.5 WM DLR-IKN 2 WM
Prototype 1
DLR
Prototype 1 Resources
DLR-IKN 3 WM
Prototype 2
ESA
Prototype 2 Resources
ESA 3 WM
Prototype 3
Prototype 3 Resources
Contribute
CNES, DLR, ESA, JAXA, NASA
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
6/1/2019
CMC-P-2019-05-005
Project Start Date
6/3/2019
Internal WG Review
First Draft Circulated to WG
10/1/2019
First Draft Comments Due
10/31/2019
Second draft circulated to WG
10/10/2019
Second Draft Comments Due
10/31/2019
Final WB Submitted to AD for Further Processing
11/15/2019
External Milestones
Secretariat Document Processing
5/1/2020
CESG Poll for Agency Review started 31 May 2020
First Agency Review
7/1/2020
AR Closed 2020-09-29
RID Resolution
8/30/2020
Secretariat Document Processing 2
10/1/2020
Final Agency Review
12/1/2020
Not Required
RID Resolution
1/31/2021
Not Required
First Prototype Development
5/1/2020
Second Prototype Development
5/1/2020
CMC Approval
3/1/2021
Total Time to Complete
(in months)
21
Attachments
Version: 558.0
Created at 11/8/2016 8:11 AM by Calzolari Gian Paolo
Last modified at 7/11/2023 7:46 AM by Felix Flentge