You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
SOIS Subnetwork Packet Service 5 Year Book Review
Approval
Approved
Document Number
851.0
Charter
4.01 Subnetwork Services Working Group
Document Type
Magenta
Description of Document
This is an existing document to undergo 5 year review, especially for deterministic networks and streaming service. The document has 5 major sections: Section 1 - definitions & references; Section 2 - general concepts and assumptions; Section 3 - Sub-network Packet Service specification; Management Information Base (MIB) for Service' Section 5 - Service conformance statement proforma.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
This is existing service magenta book that is being reviewed.
Resources
Book Editor
NASA
Book Editor Resources
80 hours
Prototype 1
Prototype 1 Resources
Prototype 2
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
FSA
Monitor Only
ESA
Resource Comments
The books really need to reviewed as a group and salient use cases applied for deterministic examples, so length of time to complete will be spread-out over 1 year.
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
9/16/2016
Project Start Date
10/17/2016
Internal WG Review
First Draft Circulated to WG
12/5/2016
First Draft Comments Due
1/31/2017
Second draft circulated to WG
2/28/2017
Second Draft Comments Due
4/3/2017
Final WB Submitted to AD for Further Processing
5/5/2017
External Milestones
Secretariat Document Processing
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
Total Time to Complete
(in months)
-1,379
Attachments
Version: 439.0
Created at 7/21/2016 7:48 PM by Rakow Glenn
Last modified at 12/9/2021 9:06 AM by Brian Oliver