Overview

Project Title

CCSDS Global Spacecraft Identifier Field: Code Assignment Control Procedures (Issue 7)

Approval

Approved

Document Number

320.0

Charter

1.01 System Architecture Working Group

Document Type

Magenta

Description of Document

This document describes the procedures for assigning Global Spacecraft Identifier Field codes. Historically it was marked as a Blue Book, but it is really a Magenta Book in nature (procedures for agencies and CCSDS). As part of this revision the boiler-plate will be updated. The other changes are to align it with the new CCSDS Registry Management Policy document that is in work and with the revised SANA organization, contact, and OID registries and procedures. A second task under discussion is to adopt a set of frequency band "bins" so as to increase the available set of code points. This may be done as a second phase, depending upon the level of discussion that surfaces in the concerned WGs, particularly from SLS and CSS.

Applicable Patents

There are no patent issues for this technology that are known by the CCSDS community

Patent Comments

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

This document is unique to CCSDS.

Resources

Book Editor

NASA

Book Editor Resources

2 MW

Prototype 1

Prototype 1 Resources

N/A

Prototype 2

Prototype 2 Resources

N/A

Prototype 3

Prototype 3 Resources

Contribute

ESA

Monitor Only

CNES

Resource Comments

This is a low impact editing task with little technical content. The only thing that will impact resources is if there is difficulty in reaching consensus on the adoption of frequency bins for SCID assignment.

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet1/4/2016
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet1/4/2016Draft of modified document already exists
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet2/1/2016
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet2/15/2016
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet3/7/2016
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet3/28/2016
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet4/11/2016
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet5/16/2016Cleared CESG review
First Agency ReviewMagenta BulletBlue Bullet6/13/2016
RID ResolutionMagenta BulletBlue Bullet8/15/2016
Secretariat Document Processing 2Magenta BulletBlue Bullet9/12/2016
Final Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
First Prototype DevelopmentBlue Bullet
Second Prototype DevelopmentBlue Bullet
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet11/14/2016
Total Time to Complete
(in months)
10
Attachments
Version: 261.0
Created at 9/28/2015 6:17 PM by Shames Peter
Last modified at 10/16/2018 6:04 AM by Tom Gannett