You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Secure Software Engineering for Space Missions
Approval
Approved
Document Number
Charter
1.02 Security Working Group
Document Type
Magenta
Description of Document
This document will describe secure software engineering principles and methodologies for the development of mission software - both for space and ground systems.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
Prototype 1
Not Required
Prototype 1 Resources
Prototype 2
Not Required
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
ESA, NASA
Monitor Only
CSA, CNES, DLR, ESA, NASA, UKSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
6/30/2021
Project Start Date
7/1/2021
Internal WG Review
First Draft Circulated to WG
9/1/2021
First Draft Comments Due
10/15/2021
Second draft circulated to WG
12/1/2021
Second Draft Comments Due
2/1/2022
Final WB Submitted to AD for Further Processing
3/1/2022
External Milestones
Secretariat Document Processing
6/1/2022
First Agency Review
9/1/2022
RID Resolution
10/15/2022
Secretariat Document Processing 2
12/1/2022
Final Agency Review
2/1/2023
RID Resolution
4/1/2023
First Prototype Development
Second Prototype Development
CMC Approval
6/1/2023
Total Time to Complete
(in months)
23
Attachments
Version: 276.0
Created at 5/29/2015 12:09 PM by Weiss Howard
Last modified at 7/26/2024 2:50 PM by Howard Weiss