Overview

Project Title

Mission Operations - Message Abstraction Layer Binding to TCP/IP Transport and Split Binary Encoding

Approval

Approved

Document Number

524.2

Charter

2.04 Spacecraft Monitoring and Control Working Group

Document Type

Blue

Description of Document

Mission Operations binding to TCP/IP Transport and Split Binary Encoding.

Applicable Patents

There are no patent issues for this technology that are known by the CCSDS community

Patent Comments

None

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

The Blue Book will be based on the already established template for MO binding blue books (e.g. SPP). Hence less effort.

Resources

Book Editor

ESA

Book Editor Resources

6mm. The specification of MO bindings to a transport and encoding is not a complext conceptual matter but more a question of a mapping. The existing SPP blue book provides a good template for producing other binding specifications. However a major part of the work is already done in the context of a parallel ESA activity (outside CCSDS), which has produced a draft specification in the expected Blue Book format. Hence it is expected that 1mm of effort shall be needed in the WG for the review and finalisation of the book.

Prototype 1

ESA

Prototype 1 Resources

3mm. See note above. As part of the above mentioned ESA parallel activity a PoC implementation will be produced, which can facilitate the prototyping activity.

Prototype 2

CNES

Prototype 2 Resources

CNES

Prototype 3

Prototype 3 Resources

Contribute

CNES, DLR, FSA, NASA, UKSA

Monitor Only

JAXA

Resource Comments

See notes above.

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet3/31/2015
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet6/30/2015
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet6/30/2015
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet11/30/2015
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet1/31/2016
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet2/28/2016
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet3/31/2016
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet
First Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
Secretariat Document Processing 2Magenta BulletBlue Bullet
Final Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
First Prototype DevelopmentBlue BulletCNES
Second Prototype DevelopmentBlue BulletESA
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet12/15/2016CMC Approved
Total Time to Complete
(in months)
17
Attachments
Version: 336.0
Created at 3/26/2015 5:28 PM by Sarkarati Mehran
Last modified at 12/4/2017 12:43 PM by Brian Oliver