You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Delta-DOR Architectural guidelines
Approval
Approved
Document Number
506.2
Charter
1.06 Delta-DOR Working Group
Document Type
Magenta
Description of Document
This book provides the guidelines concerning the space segment in terms of the spacecraft signal structure and the ground systems in terms of the receiver characteristics and media calibrations systems to be followed to meet specific Delta-DOR target performance.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
No patent issues
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
NASA: (4WM)
Prototype 1
Prototype 1 Resources
Prototype 2
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
FSA, JAXA, NASA
Monitor Only
FSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
3/31/2015
Project Start Date
4/1/2017
Internal WG Review
First Draft Circulated to WG
10/31/2017
First Draft Comments Due
12/30/2017
Second draft circulated to WG
3/15/2018
Second Draft Comments Due
4/15/2018
Final WB Submitted to AD for Further Processing
5/30/2018
External Milestones
Secretariat Document Processing
7/30/2018
First Agency Review
9/30/2018
RID Resolution
4/15/2019
Secretariat Document Processing 2
6/15/2019
Final Agency Review
8/15/2019
RID Resolution
10/31/2019
First Prototype Development
Second Prototype Development
CMC Approval
12/31/2019
Total Time to Complete
(in months)
32
Attachments
Version: 603.0
Created at 2/12/2015 11:08 AM by Mercolino Mattia
Last modified at 2/22/2024 4:18 PM by Brian Oliver