Overview

Project Title

Update TM channel coding Blue Book with LDPC slicing

Approval

Approved

Document Number

131.0

Charter

5.02 Space Link Coding and Synchronization Working Group

Document Type

Blue

Description of Document

Objective of this project is to add LDPC slicing to the LDPC Codes relevant section(s) TM channel coding in the Blue Book (131.0-B). The feature will add a mechanism similar to the one already used for SCCC (131.2-B) and DVB-S2 (131.3-B). The change will be done via a pink sheet in the framework of the 3-years review of the 131.0-B (review relative to the LDPC portion, added to the book in 2011).

Applicable Patents

There are no patent issues for this technology that are known by the CCSDS community

Patent Comments

Patents for LDPC technology have been already covered by appropriate ISO forms (submitted when LDPC was added to the Blue Book). The new feature (slicing) is not covered by any known patent

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

Resources

Book Editor

NASA

Book Editor Resources

Total resources 3mm s. Book editor (NASA), TBC

Prototype 1

NASA

Prototype 1 Resources

3mm+NASA

Prototype 2

NASA

Prototype 2 Resources

3mm+NASA

Prototype 3

Prototype 3 Resources

Contribute

Monitor Only

CNES, DLR, ESA

Resource Comments

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet3/1/2014In time for 2014 Spring meeting
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet3/18/2014
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet4/2/2014At Fall 2014 Meeting
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet5/30/2014At Spring 2015 Meeting
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet9/26/2014Before Fall 2015 Meeting
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet10/31/2014At Fall 2015 Meeting
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet11/28/2014After Spring 2016 Meeting
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet1/9/2015Start of Review after CESG + CMC Polls
First Agency ReviewMagenta BulletBlue Bullet3/1/2015End of Review
RID ResolutionMagenta BulletBlue Bullet7/1/2015At/After Spring 2017 meeting
Secretariat Document Processing 2Magenta BulletBlue Bullet8/1/2015Start of 2nd Review (if needed). No Polls.
Final Agency ReviewMagenta BulletBlue Bullet10/1/2015
RID ResolutionMagenta BulletBlue Bullet11/30/2015
First Prototype DevelopmentBlue Bullet11/30/2015
Second Prototype DevelopmentBlue Bullet11/30/2015
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet2/1/2016Includes Final Secretariat Document Processing + CESG Poll + CMC Poll for PUBLICATION
Total Time to Complete
(in months)
22
Attachments
Version: 307.0
Created at 2/14/2014 4:44 PM by CCSDS Framework
Last modified at 9/13/2017 4:40 PM by Brian Oliver