You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Atmospheric Characterization for Optical Communications Systems
Approval
Approved
Document Number
140.1
Charter
5.10 Optical Communications Working Group
Document Type
Green
Description of Document
This Green Book will define the physical quantities to be measured at existing and potential optical ground station sites in support of space-Earth links CFLOS (Cloud-Free Line-Of-Sight) and link budget calculations. Contents of the Green Book: • Physical Quantities to be Measured • Material supporting the use of the parameters o Long term statistics o Real-time measurements o Predictive Weather
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
Other
Book Editor Resources
4mm (NICT) Japan is Book Editor
Prototype 1
Not Required
Prototype 1 Resources
Prototype 2
Not Required
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
ESA, NASA
Monitor Only
CNES, DLR, JAXA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
1/1/2014
Project Start Date
12/28/2013
Internal WG Review
First Draft Circulated to WG
5/30/2014
After Spring 14 Meeting
First Draft Comments Due
9/30/2014
Before Fall 14 Meeting
Second draft circulated to WG
3/1/2015
Just Before Fall 2015 Meeting
Second Draft Comments Due
7/30/2015
After Fall 2015 Meeting
Final WB Submitted to AD for Further Processing
11/30/2015
After Spring 2016 Meeting
External Milestones
Secretariat Document Processing
12/31/2015
Date of CESG Poll start
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
3/3/2016
Includes Final Secretariat Document Processing + CESG Poll + CMC Poll for PUBLICA TION
Total Time to Complete
(in months)
26
Attachments
Version: 345.0
Created at 1/13/2014 9:43 PM by CCSDS Tech Support
Last modified at 11/8/2017 10:59 PM by Brian Oliver