You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Spectral Pre-Processing Transform for Multispectral & Hyperspectral Image Compression
Approval
Approved
Document Number
122.1
Charter
5.03 Data Compression Working Group
Document Type
Blue
Description of Document
This Recommended Standard defines a multispectral & hyperspectral image compressor as an extension to the 122.0 Blue Book by defining a one-dimensional pre-processing spectral decorrelating transform and associated output data structures. This allows the CCSDS-122.0-B (two-dimensional) image compressor to provide effective compression of multispectral and hyperspectral (3-dimensional) images.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
0.3 Aaron Kiely (NASA)
Prototype 1
CNES
Prototype 1 Resources
0.2
Prototype 2
NASA
Prototype 2 Resources
0.5
Prototype 3
Prototype 3 Resources
Contribute
Monitor Only
CSA, DLR, ESA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
11/8/2013
CMC-P-2013-11-004
Project Start Date
11/29/2013
Internal WG Review
First Draft Circulated to WG
1/1/2014
First Draft Comments Due
3/15/2014
Second draft circulated to WG
6/1/2014
Second Draft Comments Due
10/1/2014
Final WB Submitted to AD for Further Processing
11/29/2014
External Milestones
Secretariat Document Processing
2/1/2015
First Agency Review
4/1/2015
RID Resolution
5/1/2015
Secretariat Document Processing 2
6/1/2015
Final Agency Review
8/1/2015
RID Resolution
11/15/2015
First Prototype Development
11/29/2014
Second Prototype Development
11/29/2014
CMC Approval
1/1/2016
Total Time to Complete
(in months)
25
Attachments
Version: 581.0
Created at 10/30/2013 3:14 PM by Kiely Aaron
Last modified at 9/13/2017 3:26 PM by Brian Oliver