You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Unified Space Data Link Protocol Green Book
Approval
Approved
Document Number
700.1
Charter
5.04 Space Link Protocols Working Group
Document Type
Green
Description of Document
This work will describe the concepts, rationale, requirements, and operational scenarios envisioned towards a new generic CCSDS Data Link layer protocol, the Next Generation Space Link layer Protocol (NGSLP) examining all CCSDS space links i.e., Direct to Earth (DTE), Direct from Earth (DFE), and Proximity Environments). This project is the direct follow on result of the initial concept paper, which the WG produced as a prerequisite for the approval of this project. The NGSLP is targeted for agencies emerging missions, both human and robotic, which we anticipate will require higher performance (higher data rates and throughput) and operate with enhanced security. We define a new space data link layer protocol that is largely based upon the proven features of the existing CCSDS link protocols and adds options that can be used to tailor future mission link layer needs. In addition, the interfaces with other CCSDS working groups such as the emerging channel coding option of decoupling the transfer frame length from the code block size currently under study by the C&S WG will be investigated. This option would remove the constraint to align the transfer frame with the code block, allowing frame sizes to be explicitly tailored to mission requirements and enable future mission operational link layer modes. We believe this project should be immediately approved because of the long lead time required to develop standards, the emerging link layer requirements of the newly formed optical comm WG, and the changes to agencies space and ground link layer infrastructure required to support the emerging Space Data Link Security (SDLS) protocol and substantial increases in link data rates, provides an opportunity to introduce future link layer modifications. This Project is related to the NGSLP Blue Book Project described in the framework. This GB project extends past the BB project, because we envision that in the actual writing of the BB, some concepts identified in the GB may change, and there the GB might require an update before publication.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
No patent issues.
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
NASA will provide the Book Editor. Assume 6MM required.
Prototype 1
Not Required
Prototype 1 Resources
Prototype 2
Not Required
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
DLR, NASA, UKSA
Monitor Only
CNES, ESA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
10/31/2013
CMC-P-2014-08-004 Confirmed by CNES delegate.
Project Start Date
10/15/2014
Internal WG Review
First Draft Circulated to WG
12/15/2013
First Draft Comments Due
2/10/2014
Second draft circulated to WG
4/21/2014
Before Fall 2015 meeting
Second Draft Comments Due
5/21/2014
Before Fall 2019 meeting
Final WB Submitted to AD for Further Processing
6/21/2014
External Milestones
Secretariat Document Processing
9/15/2014
Poll CESG-P-2020-04-004 started 30 April 2020
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
3/22/2016
Poll CMC-P-2020-06-004 closed 15 June 2020
Total Time to Complete
(in months)
17
Attachments
Version: 386.0
Created at 10/22/2013 1:13 PM by Kazz Greg