You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Pseudo-Noise (PN) Ranging Systems (Review of Issue 1 GREEN BOOK)
Approval
Approved
Document Number
414.0
Charter
5.01 RF and Modulation Working Group
Document Type
Green
Description of Document
This Informational Report is an adjunct document to the CCSDS Recommended Standard for Pseudo-Noise (PN) Ranging Systems (CCSDS 414.1-B-1).It provides background information and discussion of technical details related to the PN ranging systems defined by the CCSDS Recommended Standard.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
No changes with respect to Issue 1.
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
Very low effort changes consequent to related Blue Book 414.1 update.
Prototype 1
Not Required
Prototype 1 Resources
Prototype 2
Not Required
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
ESA, NASA
Monitor Only
CNES, ESA, NASA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
5/30/2013
CMC-P-2013-04-003
Project Start Date
5/14/2013
Internal WG Review
First Draft Circulated to WG
6/1/2013
Before Fall 2013 Meeting
First Draft Comments Due
2/1/2014
Second draft circulated to WG
3/1/2014
not needed
Second Draft Comments Due
9/30/2014
not needed
Final WB Submitted to AD for Further Processing
1/30/2015
External Milestones
Secretariat Document Processing
2/15/2015
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
3/30/2015
CMC Approved Poll
Total Time to Complete
(in months)
22
Attachments
Version: 147.0
Created at 4/25/2013 5:52 AM by Calzolari Gian Paolo
Last modified at 4/6/2014 8:20 PM by CCSDS Tech Support