You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
SLE Application Program Interface for Return Channel Frames Service: M-1 Update
Approval
Approved
Document Number
915.2
Charter
3.06 Cross Support Transfer Services Working Group
Document Type
Magenta
Description of Document
This Recommended Practice specifies a C++ Application Program Interface (API) for the CCSDS Space Link Extension Return Channel Frames (RCF) Service. The API is intended for use by application programs implementing the SLE RCF Service.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
NOTE: The work is limited to Pink Sheets.
Prototype 1
Not Required
Prototype 1 Resources
Not required for Magenta Book update.
Prototype 2
Not Required
Prototype 2 Resources
Not required for Magenta Book update.
Prototype 3
Prototype 3 Resources
Contribute
CNES, ESA, NASA
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
9/15/2012
15 September 2012
Project Start Date
9/7/2012
Internal WG Review
First Draft Circulated to WG
9/15/2012
15 September 2012, before Fall 2012 Meeting
First Draft Comments Due
10/15/2012
15 October 2012, due @ Fall 2012 Meeting
Second draft circulated to WG
12/15/2012
30 January 2014
Second Draft Comments Due
2/15/2013
Final WB Submitted to AD for Further Processing
3/15/2013
20 March 2014 (actually, it is not a WB but is MG2)
External Milestones
Secretariat Document Processing
4/15/2013
16 June 2014
First Agency Review
6/15/2013
Pink Sheets to be apprioved by CESG+CMC
RID Resolution
9/15/2013
Secretariat Document Processing 2
10/15/2013
Final Agency Review
10/15/2013
NOT EXPECTED FOR PINK SHEETS
RID Resolution
10/15/2013
NOT EXPECTED FOR PINK SHEETS
First Prototype Development
NOT REQUIRED
Second Prototype Development
NOT REQUIRED
CMC Approval
12/15/2013
CMC Approved
Total Time to Complete
(in months)
15
Attachments
Version: 368.0
Created at 7/16/2012 10:30 AM by Calzolari Gian Paolo
Last modified at 10/12/2015 6:55 PM by CCSDS Tech Support