You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Proximity-1 Space Link Protocol—Physical Layer, Issue 4
Approval
Approved
Document Number
211.1
Charter
5.01 RF and Modulation Working Group
Document Type
Blue
Description of Document
The CCSDS Recommended Standard for Proximity-1 Space Link Protocol--Data Link Layer specifies the protocol, services, and procedures pertaining to the CCSDS Version-3 Transfer Frame. This project will update the current CCSDS 211.1-B-3 Proximity-1 Space Link Protocol—Physical Layer. Blue Book. Issue 3. March 2006.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
N/A
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
ESA
Prototype 1
Not Required
Prototype 1 Resources
Not Required. This review does not intruduce new features and then there is no need for prototypes.
Prototype 2
Not Required
Prototype 2 Resources
Not Required. This review does not intruduce new features and then there is no need for prototypes.
Prototype 3
Prototype 3 Resources
Contribute
ESA, FSA, NASA
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
12/16/2011
Project Start Date
12/16/2011
Internal WG Review
First Draft Circulated to WG
12/16/2011
First Draft Comments Due
12/16/2011
Second draft circulated to WG
12/16/2011
Second Draft Comments Due
12/16/2011
Final WB Submitted to AD for Further Processing
12/19/2011
External Milestones
Secretariat Document Processing
1/31/2012
Agency review started on 19 March 2012, ending 1 June 2012
First Agency Review
3/31/2012
RID Resolution
4/30/2012
Secretariat Document Processing 2
5/30/2012
Delayed by discussion on (P)ICS; CESG-P-2013-11-007
Final Agency Review
7/30/2012
NOT needed
RID Resolution
9/30/2012
NOT needed
First Prototype Development
9/30/2012
NOT needed
Second Prototype Development
9/30/2012
NOT needed
CMC Approval
10/30/2012
CMC-P-2013-12-006 APPROVAL
Total Time to Complete
(in months)
10
Attachments
Version: 59.0