You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Pointing Requests Message
Approval
Approved
Document Number
509.0
Charter
2.02 Navigation Working Group
Document Type
Blue
Description of Document
The Pointing Request Message (PRM) allows space agencies and operators to exchange information in a standardized format about a requested pointing of a spacecraft. These can be requested (sequences of) changes of the attitude of the spacecraft or of an articulate spacecraft component. The PRM facilitates interoperability between space agencies; e.g., where Agency/Operator A operates a spacecraft which provides a relay for a rover operated by Agency/Operator B or where an instrument owned and operated by Agency/Operator A is embarked on a spacecraft operated by Agency/Operator B. It can be used internally within a single agency or organization as well.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
At this time (05/2011) there are no known or potential patent licenses that apply to the standards developed by the Navigation Working Group.
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
Prototype 1
ESA
Prototype 1 Resources
Prototype 2
JAXA
Prototype 2 Resources
Note - The Prototype 2 will also be done by NASA, CNES and AGI
Prototype 3
Prototype 3 Resources
Contribute
CNES, DLR, NASA
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
5/6/2010
Complete
Project Start Date
5/6/2010
Complete
Internal WG Review
First Draft Circulated to WG
6/30/2011
Complete
First Draft Comments Due
7/30/2011
Complete
Second draft circulated to WG
7/29/2012
Complete
Second Draft Comments Due
8/28/2012
Complete
Final WB Submitted to AD for Further Processing
9/27/2012
Complete
External Milestones
Secretariat Document Processing
11/26/2012
Complete
First Agency Review
2/24/2013
Complete
RID Resolution
6/24/2013
Complete
Secretariat Document Processing 2
7/24/2013
Not Necessary (only one review)
Final Agency Review
10/22/2013
Complete (First Agency Review = Final)
RID Resolution
2/19/2014
Complete (First Agency Review = Final)
First Prototype Development
8/18/2014
Complete (Spring Meetings 2017)
Second Prototype Development
8/18/2014
Complete
CMC Approval
9/17/2014
Complete: CMC E-Poll Identifier CMC-P-2018-01-005
Total Time to Complete
(in months)
52
Attachments
Version: 570.0
Created at 12/10/2010 6:40 PM by Berry David
Last modified at 2/25/2018 6:38 PM by David Berry