You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Proximity-1 Space Link Protocol—Data Link Layer - Issue 5
Approval
Approved
Document Number
211.0
Charter
5.04 Space Link Protocols Working Group
Document Type
Blue
Description of Document
When the following CCSDS Link Layer documents are due for their mandatory 5-year review. Note - the review of each document depends upon the last issue date. The document under current review is the Prox-1 Space Data Link protocol (the C&S WG is also reviewing the Sync and channel Prox-1 book.) The RF&Mod WG is reviewing simultaneously the prox-1 Physical layer.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
There are no patents envisioned in this WG
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
Heavy Technical work of reviewing and updating the document has taken place. Next effort involves resolving RIDs (anticipated to be around 10 or so) from the current agency review and making appropriate changes to document concurred by WG. Level of effort is .1 FTE from July 2012 to Nov 2013.
Prototype 1
Not Required
Prototype 1 Resources
NASA has already implemented Proximity-1 in CE 505 and Electra transceivers. This project is adding no new feature requiring prototypes.
Prototype 2
Not Required
Prototype 2 Resources
ESA has already implemented Proximity-1 in Melecom transceiver. This project is adding no new feature requiring prototypes.
Prototype 3
Prototype 3 Resources
Contribute
ESA, NASA, UKSA
Monitor Only
CNES, ESA, NASA, UKSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
12/15/2009
Project Start Date
12/15/2009
Internal WG Review
First Draft Circulated to WG
4/15/2010
First Draft Comments Due
4/26/2010
Second draft circulated to WG
6/15/2010
Second Draft Comments Due
8/30/2010
Final WB Submitted to AD for Further Processing
9/15/2010
Pink Book
External Milestones
Secretariat Document Processing
9/30/2010
Agency review started on 19 March 2012, ending 1 June 2012
First Agency Review
10/15/2010
RIDs collected
RID Resolution
12/15/2010
Delayed by discussion on (P)ICS
Secretariat Document Processing 2
1/15/2011
CESG-P-2013-11-006
Final Agency Review
2/1/2011
NOT needed
RID Resolution
3/1/2011
NOT needed
First Prototype Development
12/1/2010
NOT neeeded. No new features.
Second Prototype Development
5/1/2011
NOT neeeded. No new features.
CMC Approval
5/1/2011
CMC-P-2013-12-005 APPROVED
Total Time to Complete
(in months)
16
Attachments
Version: 236.0
Created at 12/2/2009 5:54 PM by Kazz Greg
Last modified at 4/6/2014 8:20 PM by CCSDS Tech Support