You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
SOIS-WIR RFID-Based Inventory Management Systems
Approval
Document Number
881.0
Charter
4.03 Onboard Wireless Working Group
Document Type
Magenta
Description of Document
Inventory management is a critical function in many aspects of space operations, both in flight and ground segments. On the ground, thousands of controlled components and assemblies are stored in bond rooms across multiple centers and space agencies. These inventories of necessity must be tightly controlled. The Inventory Management and Asset Localization Magenta Book will provide a CCSDS reference document prescribing best practices and recommended protocol standards for accomplishing automated inventory management and asset localization using wireless technologies.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
Book Editor Resources
Prototype 1
Prototype 1 Resources
Prototype 2
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
6/1/2009
Project Start Date
Internal WG Review
First Draft Circulated to WG
7/1/2009
First Draft Comments Due
10/1/2009
Second draft circulated to WG
10/15/2009
Second Draft Comments Due
11/15/2009
Final WB Submitted to AD for Further Processing
12/1/2009
Get early feedback from SOIS A.D.
External Milestones
Secretariat Document Processing
1/1/2010
First Agency Review
3/1/2010
RID Resolution
5/1/2010
Secretariat Document Processing 2
6/1/2010
Final Agency Review
7/1/2010
RID Resolution
8/1/2010
First Prototype Development
Second Prototype Development
CMC Approval
10/1/2010
Posted to CCSDS Publication Area.
Total Time to Complete
(in months)
1,307
Attachments
Version: 74.0
Created at 5/22/2009 12:57 PM by Gifford Kevin
Last modified at 12/2/2013 5:05 PM by CCSDS Tech Support