You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Evolutions of CCSDS recommendations for RF & Modulation systems, part 1
Approval
Approved
Document Number
401.0
Charter
5.01 RF and Modulation Working Group
Document Type
Blue
Description of Document
Recommendations for Radio Frequency and Modulation Systems, Part 1, focus upon the standardization of RF and modulation systems for Earth stations and spacecraft. These Recommendations do not provide specific designs. Rather they describe certain capabilities and provide technical characteristics in sufficient detail so that an agency may design compatible equipment. Guidelines are also provided for the use of agencies’ RF and modulation systems, as well as their use of the RF spectrum. Because an ability to provide cross support implies some standardization of design and operations, certain procedural Recommendations have been included to assist in these areas.
Recommendations are assigned to one of three sections depending upon whether their primary focus is technical, policy, or procedural in nature. These Recommendations are intended to promote an orderly transition to RF and modulation systems that are internationally compatible. The CCSDS believes that this course will not only assure better engineering practices but, also, that it will facilitate international cross support agreements. These recommendations are gathered in CCSDS document 401.0-B. This blue book is regularly updated and complemented by the RF & Modulation WG to either incorporate new recommendations (e.g. : modulation types for new frequency bands), or to reflect evolving techniques for existing frequency bands and mission types. The CWE Project for the Evolutions of CCSDS recommendations for RF & Modulation systems, part 1 will update the document according to the evolving issues identified in the RFM Charter.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
None identified to date
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
ESA
Prototype 1
ESA
Prototype 1 Resources
ESA, NASA
Prototype 2
NASA
Prototype 2 Resources
ESA, NASA
Prototype 3
Prototype 3 Resources
Contribute
CNES, DLR, FSA
Monitor Only
JAXA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
10/15/2008
SLS area approval of updated RFM WG charter at Spring 2009 meeting.
Project Start Date
10/15/2008
Internal WG Review
First Draft Circulated to WG
11/30/2008
First Draft Comments Due
1/30/2009
Second draft circulated to WG
4/15/2009
Second Draft Comments Due
6/15/2009
Final WB Submitted to AD for Further Processing
10/30/2009
External Milestones
Secretariat Document Processing
12/30/2009
First Agency Review
2/20/2010
RID Resolution
4/30/2010
Secretariat Document Processing 2
5/30/2010
Final Agency Review
9/30/2010
RID Resolution
11/15/2010
First Prototype Development
5/30/2010
Second Prototype Development
6/30/2010
CMC Approval
4/10/2011
Total Time to Complete
(in months)
29