You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Tracking Data Cross support Transfer Service
Approval
Approved
Document Number
922.2
Charter
3.06 Cross Support Transfer Services Working Group
Document Type
Blue
Description of Document
This Recommendation defines the Streaming Tracking Data Service Cross Support Transfer Service (TD-CSTS). The TD-CSTS is a transfer service that allows a spaceflight mission to receive periodic measurements of tracking data as soon as they are generated by a Cross Support Complex or anytime thereafter. The TD-CSTS delivers the tracking data formatted in accordance with the CCSDS Tracking Data Message Recommended Standard (TDM). The TD-CSTS is constructed using procedures and operations defined in the Cross Support Transfer Services Specification Framework and in conformance with the Guidelines for the Specification of Cross Support Transfer Services
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
NASA - J.Pietras
Prototype 1
DLR
Prototype 1 Resources
Prototype 2
NASA
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
CNES, DLR, ESA
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
11/14/2004
Project Start Date
11/14/2004
Internal WG Review
First Draft Circulated to WG
8/15/2009
First Draft Comments Due
9/15/2009
Second draft circulated to WG
12/1/2009
Second Draft Comments Due
4/1/2010
Final WB Submitted to AD for Further Processing
6/1/2010
External Milestones
Secretariat Document Processing
7/1/2010
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
2nd/Final agency review not required
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
4/1/2011
Total Time to Complete
(in months)
75
Attachments
Version: 1260.0
Created at 10/21/2008 4:19 AM by Doat Yves
Last modified at 5/27/2020 3:03 PM by Laura Stafford