You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Space Assigned Numbers Authority (SANA)-Role, Responsibilities, Policies and Procedures (Yellow Book, Issue 2)
Approval
Approved
Document Number
CCSDS 313.0-Y (Issue 2)
Charter
1.04 Space Assigned Numbers Authority Working Group
Document Type
Yellow
Description of Document
This is the second issue of the SANA Yellow Book. It contains minor updates for clarity and to align with the CCSDS Registry Management Policy document that is also proposed as part of the System Architecture WG program of work. \n This document describes the policies for overall SANA operations, the other document includes specific core registry management policies and procedures (q.v.).
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
0.5 MM
Prototype 1
Prototype 1 Resources
N/A
Prototype 2
Prototype 2 Resources
N/A
Prototype 3
Prototype 3 Resources
Contribute
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
1/20/2014
1/20/2014
1/20/2014
Project Start Date
1/20/2014
1/20/2014
1/20/2014
Internal WG Review
First Draft Circulated to WG
1/20/2014
1/20/2014
First Draft Comments Due
1/20/2014
1/20/2014
Second draft circulated to WG
6/3/2015
6/3/2015
6/3/2015
Second Draft Comments Due
6/3/2015
6/3/2015
Final WB Submitted to AD for Further Processing
10/3/2015
10/3/2015
10/3/2015
External Milestones
Secretariat Document Processing
10/3/2015
10/3/2015
First Agency Review
11/3/2015
11/3/2015
11/3/2015
Actually CESG review, there is no agency review for CCSDS YB
RID Resolution
2/10/2016
2/10/2016
2/10/2016
Secretariat Document Processing 2
2/10/2016
2/10/2016
Final Agency Review
2/10/2016
2/10/2016
RID Resolution
2/10/2016
2/10/2016
First Prototype Development
Second Prototype Development
CMC Approval
5/30/2016
5/30/2016
5/30/2016
Total Time to Complete
(in months)
28
28
Attachments
Version: 47.0
Created at 9/28/2015 7:39 PM by Shames Peter
Last modified at 6/1/2016 1:40 PM by CCSDS Tech Support