You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Navigation Composite Message
Approval
Approved
Document Number
TBD
Charter
2.02 Navigation Working Group
Document Type
Blue
Description of Document
Since the publication of the first NavWG Recommended Standard in 2004 (the Orbit Data Messages V.1), progress in developing international standards for use in space flight dynamics operations has been regular. New areas of standardization emerged every year or two between 2007 and 2024. Yet this progress has been hampered by challenges stemming from the interrelated concepts of inheritance, duplication, and consistency. Attempts to address these challenges have consumed many of the NavWG resources (time and effort) over the years and have led to the notion of a "universal, modular message". The concept of this modular message has been a discussion topic within the NavWG since Fall 2014. Now that several outstanding projects have been published, this modularity concept can be addressed. The "Navigation Composite Message" (NCM) is proposed as a solution to some of the challenges that have been faced by the Working Group over the years.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
N/A
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
This concept involves a selective composite of features found in several existing CCSDS NavWG standards, each of which has been reasonably widely implemented and for which no similar standards are known.
Resources
Book Editor
NASA
Book Editor Resources
20 work months
Prototype 1
NASA
Prototype 1 Resources
12 work months
Prototype 2
ESA
Prototype 2 Resources
12 work months
Prototype 3
Prototype 3 Resources
Contribute
Monitor Only
Resource Comments
See Concept Paper at https://cwe.ccsds.org/moims/docs/MOIMS-NAV/Draft%20Documents/Concept%20Papers/NCM/navigation-composite-message-concept-paper-changesaccepted-20240522.pdf
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
6/30/2024
6/30/2024
6/17/2024
CMC-R-2024-06-002
Project Start Date
8/1/2024
8/1/2024
11/4/2024
Fall 2024 Meetings
Internal WG Review
First Draft Circulated to WG
10/31/2024
12/31/2024
First Draft Comments Due
11/30/2024
1/31/2025
Second draft circulated to WG
1/2/2026
1/2/2026
Second Draft Comments Due
2/2/2026
2/2/2026
Final WB Submitted to AD for Further Processing
2/15/2026
2/15/2026
External Milestones
Secretariat Document Processing
4/15/2026
4/15/2026
First Agency Review
6/15/2026
6/15/2026
RID Resolution
7/1/2026
7/1/2026
Secretariat Document Processing 2
9/1/2026
9/1/2026
Final Agency Review
11/1/2026
11/1/2026
RID Resolution
12/1/2026
12/1/2026
First Prototype Development
6/30/2027
6/30/2027
Second Prototype Development
6/30/2027
6/30/2027
CMC Approval
8/31/2027
8/31/2027
Total Time to Complete
(in months)
36
36
Attachments
Version: 120.0
Created at 5/22/2024 7:08 PM by David Berry
Last modified at 11/7/2024 6:35 PM by David Berry