You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
DELTA-DIFFERENTIAL ONE WAY RANGING (DELTA-DOR) OPERATIONS
Approval
Approved
Document Number
506.0
Charter
1.06 Delta-DOR Working Group
Document Type
Magenta
Description of Document
This Magenta Book specifies standard practices and message formats for use in the radiometric tracking technique of differential one-way range. Purpose is to enable interoperability for cross-support between Agencies. Configuration requirements for data acquisition and control parameters for data processing are given. Recent developments in the field include a new Pseudo-Noise modulation format for DOR signals that is not covered in the current Issue 2. This Issue 3 will update the recommended practice.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
This will be Issue 3 of the DDOR MB on Recommended Practice for Delta-DOR operations.
Resources
Book Editor
NASA
Book Editor Resources
0.2 FTE
Prototype 1
Not Required
Prototype 1 Resources
Prototype 2
Not Required
Prototype 2 Resources
Prototype 3
Not Required
Prototype 3 Resources
Contribute
ESA, JAXA, NASA
Monitor Only
Resource Comments
This update is central to the work of the D-DOR WG.
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
11/2/2020
11/2/2020
Project Start Date
5/3/2021
5/3/2021
Internal WG Review
First Draft Circulated to WG
10/4/2021
10/4/2021
First Draft Comments Due
2/7/2022
2/7/2022
Second draft circulated to WG
5/2/2022
5/2/2022
Second Draft Comments Due
9/5/2022
9/5/2022
Final WB Submitted to AD for Further Processing
11/15/2022
11/15/2022
External Milestones
Secretariat Document Processing
2/15/2023
2/15/2023
First Agency Review
5/2/2022
5/2/2022
RID Resolution
6/30/2022
6/30/2022
Secretariat Document Processing 2
9/30/2022
9/30/2022
Final Agency Review
12/16/2022
12/16/2022
RID Resolution
5/26/2023
5/26/2023
First Prototype Development
Second Prototype Development
CMC Approval
8/31/2023
8/31/2023
Total Time to Complete
(in months)
27
27
Attachments
Version: 85.0
Created at 1/14/2020 11:41 AM by James Border
Last modified at 12/9/2021 9:00 AM by Brian Oliver