You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Site Contents
Manage Permissions
|
Version History
Overivew
Project Title
“TM Synchronization and Channel Coding” - New randomizer for high data rates
Approval
Approved
Project Status
On Schedule
Project Phase
Project not Started
Document Number
131.0
Charter
5.02 Space Link Coding and Synchronization Working Group
Document Type
Blue
Description of Document
Update of the Telemetry coding Blue Book 131.0-B, introducing a new randomizer (based on a PN17 sequence) suitable for high data rate transmissions
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
2 man months
Prototype 1
NASA
Prototype 1 Resources
2 man months
Prototype 2
ESA
Prototype 2 Resources
2 man months
Prototype 3
Not Required
Prototype 3 Resources
Contribute
CNES, DLR, ESA
Monitor Only
CSA, CNSA, FSA, INPE, JAXA, UKSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
2/17/2020
2/17/2020
1/1/2020
Poll CMC-P-2019-12-002 closed on 31 Dec. 2019
Project Start Date
3/1/2020
3/1/2021
Internal WG Review
First Draft Circulated to WG
4/17/2020
4/17/2021
First Draft Comments Due
5/1/2020
5/1/2021
Before Spring 2020 Meetings
Second draft circulated to WG
6/1/2020
6/1/2021
After Spring 2020 Meetings
Second Draft Comments Due
6/15/2020
6/15/2021
Final WB Submitted to AD for Further Processing
7/1/2020
7/1/2021
External Milestones
Secretariat Document Processing
8/10/2020
8/10/2021
First Agency Review
9/30/2020
9/30/2021
Before Fall 2020 Meetings
RID Resolution
11/30/2020
11/30/2021
After Fall 2020 Meetings
Secretariat Document Processing 2
1/15/2021
1/15/2022
Final Agency Review
11/6/2020
11/6/2021
Not expected
RID Resolution
12/11/2020
12/11/2021
Not expected
First Prototype Development
1/15/2021
1/15/2022
NASA Prototype
First Prototype Development
1/15/2021
1/15/2022
ESA Prototype
CMC Approval
2/25/2021
2/25/2022
Total Time to Complete
(in months)
12
12
Attachments
Version: 199.0
Created at 11/27/2019 1:03 PM by Massimo Bertinelli
Last modified at 11/10/2020 3:00 AM by Gian Paolo Calzolari