Overview

Project Title

Tracking Data Message Version 3

Approval

Approved

Document Number

503.0

Charter

2.02 Navigation Working Group

Document Type

Blue

Description of Document

Improved and extended functionality version of the Tracking Data Message (TDM) Standard. The existing functionality was not extensively modified in Version 2 given the long overdue publication of revisions that arose from the 5 Year Review process. The major design points of the TDM were determined around 2003 and are due for a refresh. Various parties have expressed a desire for extensions in some areas currently excluded from or insufficiently addressed in the TDM. The purpose of this project is to examine the design points of the existing TDM and determine where they need to be extended for additional efficiency, flexibility, and system scope.

Applicable Patents

There are no patent issues for this technology that are known by the CCSDS community

Patent Comments

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

No other projects of a similar nature are known.

Resources

Book Editor

NASA

Book Editor Resources

Prototype 1

NASA

Prototype 1 Resources

Prototype 2

ESA

Prototype 2 Resources

Prototype 3

Prototype 3 Resources

Contribute

CNES, DLR, ESA, JAXA, NASA, UKSA

Monitor Only

Resource Comments

This project has the potential to require significant agency resources over a standard development period.

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet12/14/201812/14/201811/12/2018Approved @CMC 10/23-24/2018 and CMC-P-2018-10-002
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet1/7/20191/7/20195/6/2019
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet9/30/20198/31/202210/7/2022Draft P-2.0.1
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet10/31/201911/30/20225/1/2023
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet6/30/20213/29/2025
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet7/31/20214/29/2025
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet8/15/20215/30/2025
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet10/15/20217/30/2025
First Agency ReviewMagenta BulletBlue Bullet12/15/202110/14/2025
RID ResolutionMagenta BulletBlue Bullet1/31/202211/14/2025
Secretariat Document Processing 2Magenta BulletBlue Bullet2/28/20221/14/2026
Final Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
First Prototype DevelopmentBlue Bullet9/30/20226/30/2026
Second Prototype DevelopmentBlue Bullet9/30/20226/30/2026
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet11/30/20228/30/2026
Total Time to Complete
(in months)
46
90
Attachments
Version: 341.0
Created at 10/16/2018 6:18 AM by David Berry
Last modified at 11/10/2023 4:28 AM by David Berry