You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
CCSDS Space Link Protocols over ETSI DVB-S2X standard
Approval
Approved
Document Number
131.31
Charter
5.02 Space Link Coding and Synchronization Working Group
Document Type
Orange
Description of Document
Orange Book to start activities related to ETSI DVB-S2X standard (released in 2014) in order to prepare a possible introduction in the CCSDS 131.3-B.
Applicable Patents
Patent issues have been identified but appropriate ISO forms have not yet been signed. The WG requests a waiver to begin work on this project. (justify in comments). ISO forms must be secured prior to the first formal Agency review.
Patent Comments
Similar to DVB-S2 (TBC). Currently under investigation at ETSI level, up to now no new patent identified for DVB-S2X with respect to DVB-S2.
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
CNES
Book Editor Resources
Total resources: 4 work-months, shared between CNES and JAXA. Nominal time from other Working Group members to review the document. Lead editors: CNES and JAXA.
Prototype 1
CNES
Prototype 1 Resources
Compatibility and performance tests to be performed between JAXA and CNES possibly using off-the shelf (telecoms) equipment
Prototype 2
JAXA
Prototype 2 Resources
Compatibility and performance tests to be performed between JAXA and CNES possibly using off-the shelf (telecoms) equipment
Prototype 3
Prototype 3 Resources
Contribute
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
1/8/2018
1/8/2018
2/16/2018
CMC-P-2018-01-008
Project Start Date
1/15/2018
4/1/2018
4/1/2018
Internal WG Review
First Draft Circulated to WG
2/5/2018
4/1/2018
4/1/2018
First Draft Comments Due
4/2/2018
5/6/2019
6/5/2019
Second draft circulated to WG
2/4/2019
10/24/2019
10/24/2019
Second Draft Comments Due
3/25/2019
12/5/2019
12/5/2019
Final WB Submitted to AD for Further Processing
6/3/2019
5/31/2021
5/29/2021
Re submission after disapproved CESG Poll
External Milestones
Secretariat Document Processing
9/9/2019
9/1/2021
9/1/2021
CESG Poll for Publication started 31 May 2020
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
12/16/2019
12/1/2021
9/23/2021
Total Time to Complete
(in months)
23
43
Attachments
Version: 319.0
Created at 3/21/2018 11:09 PM by Brian Oliver
Last modified at 9/23/2021 8:41 AM by Brian Oliver