Overview

Project Title

Robust Compression of Fixed-Length Housekeeping Data

Approval

Approved

Document Number

124.0

Charter

5.03 Data Compression Working Group

Document Type

Blue

Description of Document

The Recommended standard defines a lossless data compressor suitable for low-complexity onboard compression of fixed-length data packets, as might commonly arise in spacecraft housekeeping data. Since housekeeping data is considered to be mission critical, the compressor shall include the option to vary the robustness of the compression system in different packet loss/corruption scenarios.

Applicable Patents

Patent issues have been identified but appropriate ISO forms have not yet been signed. The WG requests a waiver to begin work on this project. (justify in comments). ISO forms must be secured prior to the first formal Agency review.

Patent Comments

There is a patent held by ESA (POCKET+) for which signature of the ISO Form is in progress and CMC will be informed promptly when available. No other patent is known to the WG.

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

Despite there are several data compression standards, there is none dealing specifically with Fixed-Length Housekeeping Data. Existing standards CCSDS-121.0-B and CCSDS-122.0-B define data compression approaches that are not optimized to deal with the special structure of housekeeping data.

Resources

Book Editor

ESA

Book Editor Resources

3 WM

Prototype 1

ESA

Prototype 1 Resources

6 WM

Prototype 2

CNES

Prototype 2 Resources

6 WM

Prototype 3

Not Required

Prototype 3 Resources

Not Required

Contribute

CNES, ESA

Monitor Only

NASA

Resource Comments

Resources are over a planned calendar period of about two years.

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet1/30/20181/30/201812/18/2017CMC-P-2017-11-009
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet4/9/20184/9/20184/11/2018
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet4/9/20184/9/20189/18/2018
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet4/15/20184/15/201810/17/2018At Fall 2018 Meeting
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet10/1/201810/1/20184/15/2019Spring 2019 Meeting
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet11/1/201811/1/201812/18/2020
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet12/1/201812/1/20189/1/2021
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet1/30/201911/30/202111/30/2021
First Agency ReviewMagenta BulletBlue Bullet3/30/201912/30/202112/30/2021
RID ResolutionMagenta BulletBlue Bullet5/30/20192/15/20223/30/2021
Secretariat Document Processing 2Magenta BulletBlue Bullet6/30/20194/30/20224/30/2022
Final Agency ReviewMagenta BulletBlue Bullet9/30/20196/30/20226/30/2022
RID ResolutionMagenta BulletBlue Bullet11/30/20198/30/20228/30/2022
First Prototype DevelopmentBlue Bullet11/30/201910/30/20213/30/2022ESA prototype
Second Prototype DevelopmentBlue Bullet11/30/201910/30/20213/30/2022CNES Prototype
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet5/30/20209/30/20222/28/2023CMC approval for publication
Total Time to Complete
(in months)
25
53
Attachments
Version: 566.0
Created at 11/20/2017 6:04 PM by Aaron Kiely
Last modified at 3/1/2023 10:42 AM by Brian Oliver