You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Optical Communications Physical Layer
Approval
Approved
Document Number
141.0
Charter
5.10 Optical Communications Working Group
Document Type
Blue
Description of Document
This Blue Book shall define the physical layer parameters and techniques required for interoperability of Optical Communications. Issue 1 will address the high photon efficiency (HPE) scenario. Contents of the Blue Book: • Wavelength(s) / Frequency(ies) • Pointing, acquisition and tracking • Modulations
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
10mm
Prototype 1
DLR
Prototype 1 Resources
8mm by ESA
Prototype 2
NASA
Prototype 2 Resources
8mm
Prototype 3
Prototype 3 Resources
Contribute
CNES, DLR, ESA, JAXA, NASA
Monitor Only
CNSA, FSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
1/1/2014
1/1/2014
12/28/2013
Project Start Date
12/28/2013
12/28/2013
12/28/2013
Internal WG Review
First Draft Circulated to WG
5/30/2014
12/1/2016
9/30/2016
At Fall 2016 Meeting
First Draft Comments Due
9/30/2014
1/31/2017
12/31/2016
After Fall 2016 Meeting
Second draft circulated to WG
1/1/2015
3/27/2017
4/1/2017
At Spring 2017 Meeting
Second Draft Comments Due
3/30/2015
6/1/2017
5/15/2017
After Spring 2017 Meeting
Final WB Submitted to AD for Further Processing
4/30/2015
11/1/2017
6/1/2017
At Fall 2017 Meeting
External Milestones
Secretariat Document Processing
7/1/2015
1/1/2018
7/6/2017
Start of Review after CESG + CMC Polls
First Agency Review
9/30/2015
2/1/2018
2/12/2018
End of Review
RID Resolution
12/31/2015
4/1/2018
5/31/2018
After Spring 2018 Meeting
Secretariat Document Processing 2
6/1/2016
6/30/2018
12/3/2018
Start of 2nd Review (if needed). No Polls.
Final Agency Review
9/30/2016
8/30/2018
1/1/2019
Before Fall 16 Meeting
RID Resolution
12/31/2016
10/30/2018
5/6/2019
After Fall 16 Meeting
First Prototype Development
12/31/2016
10/30/2018
4/1/2019
NASA JPL
Second Prototype Development
12/31/2016
10/30/2018
4/1/2019
NASA GRC
CMC Approval
3/1/2017
8/1/2019
8/1/2019
Includes Final Secretariat Document Processing + CESG Poll + CMC Poll for PUBLICA TION
Total Time to Complete
(in months)
37
66
Attachments
Version: 326.0
Created at 1/13/2014 9:25 PM by CCSDS Tech Support
Last modified at 8/9/2019 2:44 PM by Brian Oliver