You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Version History
Overview
Project Title
Erasure Correcting Codes for Near-Earth and Deep-Space Communications
Approval
Approved
Document Number
131.5
Charter
5.02 Space Link Coding and Synchronization Working Group
Document Type
Orange
Description of Document
The focus of this project is on the applicability of erasure codes in space communications, to grant future missions of higher communication reliability. In particular, the expected outcome is to produce an orange book reporting the application scenarios and proposing the design of possible erasure coding candidates. Finally, also indications about the protocol extensions which would be required upon the code design will be also investigated and documented in the orange book.
Applicable Patents
There are patent issues in this work area, but appropriate ISO forms have been submitted indicating RAND licensing policy by the patent holder or licensor (explain in comments).
Patent Comments
German Patent DE102011103564B3 applicable to encoding. For decoding the existence of Patents WO002012025457A1, US020090292966A1, and DE102009017540A1 is reported. ISO forms are available for these 4 patents.
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
DLR
Book Editor Resources
DLR
Prototype 1
Not Required
Prototype 1 Resources
Not Required
Prototype 2
Not Required
Prototype 2 Resources
Not Required
Prototype 3
Prototype 3 Resources
Contribute
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
1/31/2011
1/31/2011
2/10/2011
CMC-P-2011-01-003 - 10 February 2011
Project Start Date
2/10/2011
2/10/2011
2/10/2011
Internal WG Review
First Draft Circulated to WG
3/30/2011
3/30/2011
3/30/2011
30 March 2011 - For discussion at Spring 2011 Meetings
First Draft Comments Due
7/30/2011
12/15/2011
12/15/2011
15 December 2011
Second draft circulated to WG
9/30/2011
3/30/2012
3/30/2012
30 March 2012 - For discussion at Spring 2012 Meetings
Second Draft Comments Due
12/15/2011
6/30/2014
6/30/2014
For finalization after Spring 2014 Meeting
Final WB Submitted to AD for Further Processing
8/30/2012
8/1/2014
8/1/2014
After Spring 2014 Meeting
External Milestones
Secretariat Document Processing
9/30/2012
9/30/2014
8/21/2014
CESG-P-2014-08-004 - 21 August 2014
First Agency Review
N/A
RID Resolution
N/A
Secretariat Document Processing 2
N/A
Final Agency Review
N/A
RID Resolution
N/A
First Prototype Development
N/A
Second Prototype Development
N/A
CMC Approval
11/30/2012
12/30/2014
11/8/2014
Winter 2014
Total Time to Complete
(in months)
21
46
Attachments
Version: 4.0
Created at 12/21/2010 2:58 AM by Calzolari Gian Paolo