You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Version History
Overview
Project Title
MO Common Object Model
Approval
Approved
Document Number
521.1
Charter
2.04 Spacecraft Monitoring and Control Working Group
Document Type
Blue
Description of Document
The MAL provides the basic toolkit of operations and messages that all services use to build their service specifications, the Common Object Model extends this to provide a service template that MO Service specifications extend. The formal COM specification is defined in terms of the MAL.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
0.5 FTE -OR- CY12 FTE: 0.3 CY13 FTE: 0.2
Prototype 1
ESA
Prototype 1 Resources
The working group estimates that this effort could potentially require 8MM of software development with C++ skills, over a 18 month period (after management approval to start). However this may be in error by 30%. It will also require a license for the X compiler, currently retailing for $25K, €19K, 315SEK.
Prototype 2
CNES
Prototype 2 Resources
The working group was unable to provide an accurate estimate for this effort.
Prototype 3
Prototype 3 Resources
Contribute
CNES, DLR, NASA, UKSA
Monitor Only
ASI, CSA, FSA, INPE, JAXA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
3/1/2009
3/1/2009
3/1/2009
Project Start Date
3/1/2009
3/1/2009
3/1/2009
Internal WG Review
First Draft Circulated to WG
4/1/2009
10/20/2010
10/20/2010
First Draft Comments Due
4/23/2009
10/28/2010
10/28/2010
Second draft circulated to WG
11/1/2009
12/31/2010
12/31/2010
Second Draft Comments Due
12/1/2009
1/15/2011
1/15/2011
Final WB Submitted to AD for Further Processing
2/1/2010
5/31/2011
5/31/2011
External Milestones
Secretariat Document Processing
4/1/2010
6/30/2011
6/30/2011
First Agency Review
6/1/2010
9/28/2011
9/28/2011
RID Resolution
10/28/2011
10/28/2011
Secretariat Document Processing 2
6/23/2012
6/23/2012
Final Agency Review
8/22/2012
8/22/2012
RID Resolution
9/21/2012
9/21/2012
First Prototype Development
7/31/2012
7/31/2012
Second Prototype Development
7/31/2012
7/31/2012
CMC Approval
9/1/2010
10/21/2012
4/3/2014
CMC Approved Poll
Total Time to Complete
(in months)
18
43
Attachments
Version: 12.0
Created at 5/16/2010 1:24 PM by CCSDS Tech Support