You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Version History
Overview
Project Title
Mission Operations - Message Abstraction Layer Binding to Space Packet Transport and Binary Encodings
Approval
Approved
Document Number
524.1
Charter
2.04 Spacecraft Monitoring and Control Working Group
Document Type
Blue
Description of Document
The lowest layer in the SM&C stack is the one that provides the actual message transfer and encoding service for the Message Abstraction Layer (MAL). The MAL formal specification defines the specific services required of the underlying message transfer service in terms of abstract service interfaces with requests, indications, and responses. A technology mapping translates these abstract required services into the capabilities provided in its concrete message transfer service. This book provides the MAL, COM and M&C Service mappitng to CCSDS Space Packet Transport.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
CNES
Book Editor Resources
Prototype 1
CNES
Prototype 1 Resources
Prototype 2
DLR
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
ESA, NASA, UKSA
Monitor Only
ASI, CSA, FSA, INPE, JAXA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
1/1/2006
1/1/2006
1/1/2006
Project Start Date
1/1/2006
1/1/2006
1/1/2006
Internal WG Review
First Draft Circulated to WG
6/2/2009
4/30/2011
4/30/2011
First Draft Comments Due
6/30/2009
10/31/2011
10/31/2011
Second draft circulated to WG
9/1/2009
5/30/2012
5/30/2012
Second Draft Comments Due
9/30/2009
6/30/2012
6/30/2012
Final WB Submitted to AD for Further Processing
10/3/2009
7/14/2012
7/14/2012
External Milestones
Secretariat Document Processing
10/6/2009
9/12/2012
9/12/2012
First Agency Review
11/17/2009
12/10/2013
12/10/2013
RID Resolution
2/15/2010
4/1/2014
4/1/2014
Secretariat Document Processing 2
4/1/2014
4/1/2014
Final Agency Review
4/1/2014
4/1/2014
RID Resolution
6/1/2015
6/1/2015
First Prototype Development
5/30/2010
1/31/2015
1/31/2015
Second Prototype Development
1/31/2015
1/31/2015
CMC Approval
7/15/2010
5/30/2015
8/29/2015
Total Time to Complete
(in months)
54
111
Attachments
Version: 13.0
Created at 5/16/2010 1:26 PM by CCSDS Tech Support