Overview

Project Title

Pseudo-Noise (PN) ranging systems

Approval

Document Number

Charter

5.06 Ranging Working Group

Document Type

Blue

Description of Document

The purpose of this document is to provide a Recommendation for Space Data System Standards in the area of transparent  and regenerative Pseudo-Noise (PN) ranging systems.  The PN ranging system is used to measure the round-trip light time between a ground station and a spacecraft.  Regenerative ranging is primarily relevant for low Signal-to-Noise Ratio (SNR) cases like those seen in deep space missions; transparent ranging is more suitable for high SNR cases or when high accuracy ranging is not required.
This Recommended Standard (414.1) defines both transparent and regenerative PN ranging systems for non data relay satellite users.  The specification for PN code components and generation, on-board spacecraft regenerative/transparent processing, ground station processing, and uplink and downlink signal modulation are defined in this document.

Applicable Patents

Patent Comments

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

Resources

Book Editor

Book Editor Resources

Prototype 1

Prototype 1 Resources

Prototype 2

Prototype 2 Resources

Prototype 3

Prototype 3 Resources

Contribute

Monitor Only

Resource Comments

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet6/15/20046/15/20046/15/2004
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet7/15/20057/15/20057/15/2005
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet10/15/200510/15/200510/15/2005
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet3/15/20063/15/20063/15/2006
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet10/15/200610/15/200610/15/2006
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet6/30/20086/30/20086/30/2008
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet8/15/20088/15/20088/15/2008
First Agency ReviewMagenta BulletBlue Bullet9/15/20089/15/20089/15/2008
RID ResolutionMagenta BulletBlue Bullet10/30/200810/30/200810/30/2008
Secretariat Document Processing 2Magenta BulletBlue Bullet12/15/200812/15/2008
Final Agency ReviewMagenta BulletBlue Bullet1/15/20091/15/2009
RID ResolutionMagenta BulletBlue Bullet3/15/20093/15/2009
First Prototype DevelopmentBlue Bullet3/15/20093/15/2009
Second Prototype DevelopmentBlue Bullet3/15/20093/15/2009
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet5/15/20095/15/20093/1/2009
Total Time to Complete
(in months)
1,291
1,291
Attachments
Version: 13.0
Created at 11/19/2008 3:45 AM by Moury Gilles
Last modified at 10/26/2011 6:33 PM by CCSDS Tech Support